L 1074: Closure between Heiligenstadt and Uder
From 12.05.2025, the L1074 between Heiligenstadt and Uder will be closed in the first construction phase.
On Monday, 12.05.2025, the renovation of the L1074 between Heiligenstadt and Uder will begin. In the first construction phase, the state road will be closed from the Rengelrode junction to the entrance to Uder. The detour will run in both directions from Heiligenstadt via the A38 to the Arenshausen junction and B80. Rengelrode can be reached from Heiligenstadt. The first construction phase will last until mid-June this year.
Bridge renovation on the L 3239 continues – one-way regulation in the direction of Kammerbach
After the winter break, Hessen Mobil is resuming work on the bridge on the L 3239 between Bad Sooden-Allendorf and Kammerbach. From March 10, 2025, work will be carried out directly on the structure to ensure long-term road safety.
What is being done?
After the on and off ramps were renewed last year, the bridge itself is now being renovated. In the first construction phase, the northern section will be repaired. Among other things, the caps, the roadway seals and the entire roadway surface will be renewed.
Restrictions and detour
During the construction work, a one-way street regulation applies in the direction of Kammerbach. This means that anyone wishing to travel to Bad Sooden-Allendorf will not be able to use the bridge. Traffic will be routed via the signposted detour – in the direction of Eschwege via Orferode, Frankershausen and the B27 and in the direction of Witzenhausen via Oberrieden, Lindewerra and Wahlhausen in the direction of Dietzenrode. Shortly before Dietzenrode, turn off in the direction of Sickenberg.